Files
betterxen/docs/risk-register.md
T

1.8 KiB

Open Phase 01 risks

ID Risk and impact Current evidence Owner and next experiment
R1 Console shader container, launch state and resource descriptors remain unknown, so the fixture cannot establish console compatibility. Public related-target specifications, class C Xbox research. Seek an authorized exact-target specification before proposing a parser.
R2 FP32 subnormal inputs can affect normal outputs. The historic V4 input-only probe reported four signed-zero mismatches. Historical host observation, pending project reproduction Metal and testing. Reproduce the original strict known answers in a bounded native Rust test.
R3 FP32 subnormal outputs can be flushed even with normal inputs. The historic V4 output-only probe reported three signed-zero mismatches. Historical host observation, pending project reproduction Metal and testing. Reproduce both signs and the boundary rounding case.
R4 The V3.1 exceptional arithmetic probe reported five subnormal mismatches and a canonical NaN payload. Historical host observation, pending project reproduction Compiler and reference. Keep the strict historical comparisons and establish the required guest policy before supporting float lowering.
R5 Redistribution rights for SDK-derived Rust bindings and locked-version attribution require review before distributing linked binaries. Pinned upstream license notices and maintainer comments R1. Review the actual linked artifact and applicable terms.
R6 Compiler and reference previously disagreed on skipped early termination and invalid buffer bindings. R2 analysis and compiler regression tests Both now check layout and buffer bindings across the stream and execution state on the selected path. Independent candidate review remains open.