mirror of
https://github.com/MacosPorters/betterxen.git
synced 2026-11-26 03:39:52 +00:00
Add gfx1030 decoding, semantic validation, Metal shader generation, and an independent CPU interpreter for three reproducible compute fixtures. Include native Metal tests, LLVM fixture verification, and the existing CI and Phase 01 handoff. Verified formatting, all-features Clippy and tests, LLVM decoding, native ARM64 linkage, and all three demo fixtures with Metal API and shader validation enabled. Signed-off-by: Ranveer Soni <git@ranveersoni.me>
1.2 KiB
1.2 KiB
Open Phase 01 risks
| ID | Risk and impact | Current evidence | Owner and next experiment |
|---|---|---|---|
| R1 | Console shader container, launch state and resource descriptors remain unknown, so the fixture cannot establish console compatibility. | Public related-target specifications, class C | Xbox research. Seek an authorized exact-target specification before proposing a parser. |
| R2 | FP32 subnormal inputs can affect normal outputs. The historic V4 input-only probe reported four signed-zero mismatches. | Historical host observation, pending project reproduction | Metal and testing. Reproduce the original strict known answers in a bounded native Rust test. |
| R3 | FP32 subnormal outputs can be flushed even with normal inputs. The historic V4 output-only probe reported three signed-zero mismatches. | Historical host observation, pending project reproduction | Metal and testing. Reproduce both signs and the boundary rounding case. |
| R4 | The V3.1 exceptional arithmetic probe reported five subnormal mismatches and a canonical NaN payload. | Historical host observation, pending project reproduction | Compiler and reference. Keep the strict historical comparisons and establish the required guest policy before supporting float lowering. |