Commit Graph
3 Commits
Author SHA1 Message Date
Ranveer Soni cc0daa79e6 fix: validate the layout of skipped fixture instructions 2026-11-22 18:29:11 +05:30
Ranveer Soni 095ec65aee test: strengthen Phase 01 mutation survivor coverage 2026-11-22 18:25:31 +05:30
Ranveer Soni 96cff7c66e feat: establish native RDNA-to-Metal recompilation foundation
Add gfx1030 decoding, semantic validation, Metal shader generation, and an independent CPU interpreter for three reproducible compute fixtures. Include native Metal tests, LLVM fixture verification, and the existing CI and Phase 01 handoff.

Verified formatting, all-features Clippy and tests, LLVM decoding, native ARM64 linkage, and all three demo fixtures with Metal API and shader validation enabled.

Signed-off-by: Ranveer Soni <git@ranveersoni.me>
2026-11-22 13:41:55 +05:30